Wednesday, 2 May 2012
Thursday, 26 April 2012
Wednesday, 25 April 2012
Monday, 16 April 2012
QUICK meeting Tomorrow after Acting Class
Quick El Flamingo session after acting.
Won't be longer then fifteen minutes, just quickly to see where we are all
at as a group.
And if you want to show us stuff do it before you cram on your Traditional Animation project.
Won't be longer then fifteen minutes, just quickly to see where we are all
at as a group.
And if you want to show us stuff do it before you cram on your Traditional Animation project.
Friday, 13 April 2012
El Flamingo Final Week Schedule
Animation: Tweak and Hook up your scenes correctly to the last one! - they're all due Thursday at class, so if I see you leaving them to Wednesday night I will not be a happy slappy Production Manager
Layout: Separate your clouds and make sure your line arts are done well!
Make a separate file for each scene, and fielded to the proper size.
Make sure all the crowds are in there! ------------All DUE MONDAY
(I will be checking and going through the hardrive on Tuesday, and spamming you if you didn't do all this!)
Compositors: Take a breather and prepare for the storm
Love your friendly neighbourhood Production Manager,
Aaron Lecools
Layout: Separate your clouds and make sure your line arts are done well!
Make a separate file for each scene, and fielded to the proper size.
Make sure all the crowds are in there! ------------All DUE MONDAY
(I will be checking and going through the hardrive on Tuesday, and spamming you if you didn't do all this!)
Compositors: Take a breather and prepare for the storm
Love your friendly neighbourhood Production Manager,
Aaron Lecools
Tuesday, 10 April 2012
Hey Check those Google Docs
If you don't use FB then you might be wondering how to tweak your scenes so they're ready to be beautiful by wednesday night. Well you should all check the google docs and fix them without ant excuses!
They've all been checked, and look pretty darn good, but we need to hook them up with each other and make minor adjustments.
They've all been checked, and look pretty darn good, but we need to hook them up with each other and make minor adjustments.
Sunday, 8 April 2012
YOU GUYS HEAR!?
YOU SHOULD CHECK OUT GOOGLE DOCKS FOR THE FIRST 3 ACTS ANIMATION FIXES WE SPENT HOURS LOOKING AT.
https://docs.google.com/spreadsheet/ccc?key=0ApCIKU-wnCnSdHNPcFJ6Wlo4QjFhLXVMX2U5VU5MTGc#gid=0
MORE TO COME!! BUT IF YOU GOT SCENES IN THE FIRST 3 ACTS, THAN WHOA ITS THE PLACE TO BE!!
https://docs.google.com/spreadsheet/ccc?key=0ApCIKU-wnCnSdHNPcFJ6Wlo4QjFhLXVMX2U5VU5MTGc#gid=0
MORE TO COME!! BUT IF YOU GOT SCENES IN THE FIRST 3 ACTS, THAN WHOA ITS THE PLACE TO BE!!
Saturday, 7 April 2012
NIGHT COLOUR
Sorry for the inconvenience but for those of you with "Night Time Chumbo" scenes if you could change the colours to the ones in the above image. Just eyedropper it and paint bucket the symbols.
THANK YOU!
THANK YOU!
Thursday, 5 April 2012
El Flamingo Schedule Week 13
Animation: Tweak and finish all your scenes!
They are due this Thursday the 12th, if I see anybody leaving them til the last minute I swear I will strike them down.
Layout: All Due this Tuesday the 10th, no excuses!
Poster: I want to see work on it on this Tuesday, it should be done by this Friday!
Alright everybody, let's make them look like gold and a half and then we'll one up a level and leave all our
problems to compositing!
They are due this Thursday the 12th, if I see anybody leaving them til the last minute I swear I will strike them down.
Layout: All Due this Tuesday the 10th, no excuses!
Poster: I want to see work on it on this Tuesday, it should be done by this Friday!
Alright everybody, let's make them look like gold and a half and then we'll one up a level and leave all our
problems to compositing!
Wednesday, 4 April 2012
YOUR ASSES ARE ON THE FLAME IF U HAVN'T DONE THEM YET
Good luck, all animation is due Thursday.
It doesn't have to be the most perfect in the world, but it does have to be animated.
I'll be giving out 10% of your mark for completion of this.
If you are not there you don't get 10%.
If you don't have all scenes animated you don't get 10%.
If you have all scenes animated and they look OK you GET 10%!
If you have all scenes animated and they are all garbage you DON'T get 10%.
Sound fair? Great.
See you Thursday happy happy gang!
-Barn
- Micheal Scott
It doesn't have to be the most perfect in the world, but it does have to be animated.
I'll be giving out 10% of your mark for completion of this.
If you are not there you don't get 10%.
If you don't have all scenes animated you don't get 10%.
If you have all scenes animated and they look OK you GET 10%!
If you have all scenes animated and they are all garbage you DON'T get 10%.
Sound fair? Great.
See you Thursday happy happy gang!
-Barn
- Micheal Scott
Sunday, 1 April 2012
Friday, 30 March 2012
Week 12 Production Schedule
Hey this is coming close to the end everybody! We've been through some nice times, some great, no bad times...
any way here's the schedule:
Animation: Finish tweening all your scenes! - This Thurs the 5th
You should already have your scenes posed out and half done already FROM LAST WEEK, so therefor this should be a breeze!
Layout: These should be all done by Tuesday the 10th (AKA You have 4 full days after Animation to do this)
Poster: This should be done Wednesday the 11th
(12 weeks in the making) I'm sure it'll look great!
NO excuses this time! We all have the same amount of work, meaning there's no reason not to have your stuff done.
If there is any problem in meeting your deadlines talk to me (Aaron), Devin or Charles or all of us
and we can work something out.
Thanks babies,
Sir Licious Lecours
any way here's the schedule:
Animation: Finish tweening all your scenes! - This Thurs the 5th
You should already have your scenes posed out and half done already FROM LAST WEEK, so therefor this should be a breeze!
Layout: These should be all done by Tuesday the 10th (AKA You have 4 full days after Animation to do this)
Poster: This should be done Wednesday the 11th
(12 weeks in the making) I'm sure it'll look great!
NO excuses this time! We all have the same amount of work, meaning there's no reason not to have your stuff done.
If there is any problem in meeting your deadlines talk to me (Aaron), Devin or Charles or all of us
and we can work something out.
Thanks babies,
Sir Licious Lecours
Sunday, 25 March 2012
Production Schedule Week 11
By Thursday respective departments should have:
Animation: All your scenes posed out, and half of them tweened and ready to go to Korea
Layout: You should have 2/3's of the backgrounds you need to paint, painted (Not much time to not
get these done)
Poster: Start painting it
(Remember: as you finish and pose your scenes mark it on the production spread)
Love,
the eighth wonder of the world
Friday, 23 March 2012
THERE IS NO A FRONT VIEW EL FLAMINGO
on the hard drive and computer. if you need it just grab it you goofball! thehehe
also a few more fists in both Chumbo and El Flamingo
also a few more fists in both Chumbo and El Flamingo
Monday, 19 March 2012
Sunday, 18 March 2012
el chumbo ugly reveal
Painted scene for when El Chumbo is unmasked. Scene cuts off at where line-art ends e.g the ear and chest.
Saturday, 17 March 2012
Friday, 16 March 2012
Schedule for week 9 to 10
Animation:
For this week I want you all to finish the scenes you guys posed out for Barney this week (Tween, antic, tweak)
And then grab 2 more of your scenes and key pose them out (if your scenes are shorted pose out 3 or 4 more!!!)
Scene Setup:
I want the scenes all set-up by this Tuesday, with or without layouts. (Not Thursday)
Layouts:
All the lines should be done now, so all you painters grab your scenes, (either from the blog, or the computer or hard drive)
and start painting them.
I WANT 1/3 of your paintings done this week ...No more dogging around on it
Poster: Define your roughs, choose your final to start painting
Music: Contact who you need
(Remember mark down in the Production Schedule what scenes you have set-up on your
own)
Love you all
Tuesday, 13 March 2012
Monday, 12 March 2012
Pan Painting -WIP
El Director wanted me to post the WIP of the pan that I'm painting. I'm hoping to get it done tomorrow, and then would also have the ground pan done as well.
YAY!
WHAM-ZANGO!!!
YAY!
WHAM-ZANGO!!!
Sunday, 11 March 2012
Subscribe to:
Posts (Atom)